Street and strip 6-point Mustang roll bar, with MM's exclusive easily-removable door bars, and no harness mount tube. Fits 2005-2014 Mustang coupe.
Note the position when the door bar is removed
This Mustang Roll Bar:
6-point
E-Z-Remove door bars
NO harness mount tube: You build your own
Does not fit Mustangs with the Glass Roof option because the headliner in those Mustangs is considerably lower and interferes with the main hoop.
2013 Note: Ford changed the interior plastic of the 2013 model year hardtop Mustangs. While all of the MM roll bars fit the 2013 models, we have not yet updated the installation instructions to show the new procedure required to trim the interior plastic around the rear braces.
Sport 4-point Mustang roll bar, with fixed harness mount tube welded in place, for 2005-2014 Mustang coupes.
This Mustang Roll Bar:4-point
NO door bars
Fixed harness mount tube
Does not fit Mustangs with the Glass Roof option because the headliner in those Mustangs is considerably lower and interferes with the main hoop.
2013 Note: Ford changed the interior plastic of the 2013 model year hardtop Mustangs. While all of the MM roll bars fit the 2013 models, we have not yet updated the installation instructions to show the new procedure required to trim the interior plastic around the rear braces.
NotesAny model roll bar that does not include high-mounted door bars and have a welded-in harness mount brace does not meet the NHRA or NMRA rules.
Roll bars should have padding wherever any part of an occupant's body may come into contact with the steel tubing. This includes hands, feet, arms, and legs, not just the occupants' heads.
Special-Order OptionDiagonal Brace: Located in the plane of the main hoop, the welded-on diagonal brace greatly improves rollover protection and increases chassis rigidity. Made from 1-3/4" diameter by 0.134" wall DOM tube.
To order a Diagonal Brace, select the "Diagonal Brace Option" checkbox before adding to your shopping cart.
We do not stock roll bars with the special-order options. Allow 4-6 weeks for manufacturing.
Learn More